EasyManua.ls Logo

Gerber GS15 Plus - Installation; Plotter Work Area

Gerber GS15 Plus
95 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7
INSTALLATION
Please unpack the plotter boxes and inventory the contents before you
begin to assemble the plotter. Follow these instructions to install the
GS15
plus
plotter to any GRAPHIX ADVANTAGE. Installation of the
GS15
plus
to other sign design systems is described separately.
Note: Should you experience difficulty during installation of the
GS15
plus
to the GRAPHIX ADVANTAGE system, contact Gerber Field
Service Department at 800-828-5406.
Plotter Work Area
1. Carefully remove the GS15
plus
from its packaging materials and
place it near the GRAPHIX ADVANTAGE system. The cable is 10
feet long, so the plotter need not be located immediately beside the
console; however, it should be close enough so there will be no
strain on the cable after installation.
2. Place the material roll holder next to the plotter on the right side.

Table of Contents

Related product manuals