Steps for the connection 63
Code no. 550038
Rev. no. 16/1018
5.3.1. CE certified models
Gas type change label
THIS EQUIPMENT WAS CONVERTED ON (DAY-MONTH-
YEAR)…………(1)…..…… TO……(2)………. GAS WITH KIT No
….(3)……BY…………(4)…………………
(name and address of organization making this conversion, who accepts the
responsibility for the correctness of this conversion).
PRESSURE ........................................................................ (5) ......................... mbar
CONSUMPTION (PROPANE GAS) ................................ (6) ......................... kg/h
(NATURAL GAS) ......................................... (7) ......................... m
3
/h
NOMINAL HEAT CONSUMPTION (Hi) .......................... (8) ......................... kW
ORIFICE (DIAMETER) ...................................................... (9) ......................... mm
Gas type change label fields
(1) Date of the change
(2) Type of gas the ironer is to be changed to
(3) Code of the gas change kit
(4) Organisation, company or ATS that has carried out the change.
(5) Gas supply pressure
(6) Massic consumption; models supplied with propane gas
(7) Volumetric consumption; models supplied with natural gas
(8) Nominal calorie cons. with regard to H
i
(9) Injector diameter.
Refer to the machine’s parts list for the codes of the various conversion kits.