We reserve the right to make changes of a technical nature 101
Internal system accessories
Installation of UZ40F1 in FWB distribution board, size 42:
Installation from the front
However, they are not compatible with the U84T, UT22C insulation parts, UZ04A1 twin tower and KCLxxx
vertical 63A phase rails.
U84T UZ4A1
UZx0F1 KCF663L UT22C
The UZx0F2 separations no longer have to be screwed on to the mounting rails (the same as the FWU
separations). They can be simply locked in at the side beneath the mounting rail.
These separations can also be screwed on to the mounting rails from the rear if necessary.