Notes: The device requires at least two fan trays and one SCM to work normally.
Verification after Installation
Verify the following when you finish the installation:
l Make sure all the cables are properly connected.
l Verify that the chassis is grounded.
l The air inlet and outlet are not blocked and the surroundings have sufficient space for hot air
dissipation.
l Ensure all hardware components, including expansion modules, power modules and fan trays
are located in the proper slots.
l Verify the voltage of power source complies with the required voltage.
123
Chapter 3 Installation