EasyManua.ls Logo

Hitachi DKC910I - Page 75

Hitachi DKC910I
212 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Copyright © 2019, 2021, Hitachi, Ltd.
DKC910IHitachi Proprietary
[INST(IN)06-01-20]
Rev.0
INST(IN)06-01-20
1. Bring the special lifter close to the Storage System to be mounted and apply the stopper to the lifter.
NOTE : When putting the Storage System on the special lifter, be sure to remove the Front
Bezel beforehand.
2. Put the Storage System on the special lifter.
Put the Storage System with its Front Bezel removed on the lifter.
3. Secure the Storage System to the lifter with a band of the lifter.
Bind the Storage System with the band tightly by tting the length of the belt to the Storage System.
Figure 6-2 Setting the Storage Systems on Special Lifter
Handle
Valve
Stopper
Band
Base
Storage System to mounted
Front side of the Storage System to be mounted

Table of Contents

Other manuals for Hitachi DKC910I

Related product manuals