5-8
5.4.3 Air joint structure and handling
- Structure diagram of joint
- Tube connection method
* Shut off primary side air before starting work.
Insert the air tube until it reaches the end.
Note:
(1) If the tube is not inserted completely, air leakage may result.
(2) After connecting tube, make sure that there is not any twisting or crushing of
tube.
- Tube removal method
* shut off primary side air before starting work.
While pressing open ring by hand, pull out air tube.
If it is hard to pull out, push it back once while pressing open ring by hand,
then pull out again.
Open ring