Preparation for first power up
The mains supply cable must remain connected to the Power supply assembly, but the mains power must remain switched OFF.
Sequentially connect each external circuit one at a time and test it to ensure it is working correctly. It is a good idea to first pull out those terminal blocks of the external circuits to be tested later. Start
with the loop circuit and leave only Loop End-1 connected in preparation for the power up.
The master alarm circuits will require an end-of-line resistor to be fitted at the last alarm device to prevent fault events being raised at the panel. If the master alarm circuits are not being used then
ensure the resistors are fitted to the Master Alarm circuit terminal blocks on the MCB.
4188-949 issue 3_05/10_Nano Comms inst. 13
Nano panel based system
Preparation for first power up
MA1+ MA1- MA2+ MA2-
If master alarms are not being used then connect
the 10K ohms End-of-line resistors to the master
alarm terminals.
DRNDRN
MAIN CONTROL BOARD
PANEL
MASTER
ALARM 1
MASTER
ALARM 2
MA1
FS2 250mA
MA2
FS3 250mA
MAIN CONTROL BOARD
PANEL
10K
O
hms -
End-of-line resistor
fitted in the last alarm sounder
Conventional
alarm sounders
MASTER
ALARM 1
PP6
MA1+ MA2+ MA2- DRN
MASTER
ALARM 2
PP7
MA1- DRN
PP6
PP7

Table of Contents

Related product manuals