EasyManua.ls Logo

Honeywell GENT Nano panel-based - How to place the system in Commissioning mode

Honeywell GENT Nano panel-based
85 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
How to place the system in 'Commissioning mode'
You can place all the zones of the system in test state by entering the Commissioning mode, which causes all the zones of the system to enter test state. Notice the common fire light will remain lit until
you exit the Commissioning mode. To enter the Commissioning mode you need to be at access level 4.
Commissioning instructions
62 4188-949 issue 3_05/10_Nano Comms inst.
How to place the system in 'Commissioning mode'
Audible
Buzzer
Select
Loop >
SelectSelect
Engineering
Menu
Control >
SelectSelect
Commission
SelectSelect
16:15 Tue 16/02/10
Enter Commissioning mode
Warning!
Entering ‘Commissioning Mode’ causes all
zones to enter test state.
ARE YOU SURE YOU WISH TO PROCEED?
Yes No
Yes
16:15 Tue 16/02/10
Exit Commissioning mode
Warning!
Entering ‘Commissioning Mode’ causes all
zones to leave test state.
ARE YOU SURE YOU WISH TO PROCEED?
Yes No
Yes
Enter
Exit
Tes t
Tes t
AUTOMATIC
Silence
Alarms
After a short
duration.
On
Flashing
Manual Call point
Test Key
Audible
Buzzer
ZONE 1
FIRE
(red LEDs)
First fire indication
(flashing LED)
Common fire LED
(Steady indication)
FIRE MESSAGE
key
Test Fire
Alarm
The PLANT equipment will not
operate during ‘Fire Test’ condition.
ZONE 1
FIRE
Fire indication
(LED Off)
Common fire LED
(Red - Steady indication)
Test Fire
Alarm
TEST FIRE
After a short
duration.

Table of Contents

Related product manuals