6.0 NetAXS Startup
6.1 LED Operation
When the panel wiring is complete, turn on the power. It might take a few minutes for the panel to
complete the power-up sequence. When the board does initialize, verify that the appropriate LEDs
identified in the following figure are in accord with the descriptions in Table 7 on page 59.
Figure 34: System, Relay and Power LEDs
(Ethernet)
(Host RS232
and
Downstream)
(Host RS485)
RDR 1
RDR 2
(Relays)
RLY
(Relays)
RLY
PWR
(Power)
Run
RDR
RDR
H485
LINK COM
DS
H232
(Readers)
(Readers)