Revision 13 ST 700 SmartLine Pressure Transmitters User’s Manual Page 97
Figure 27 ST 700 Standard Transmitter - Meter Body Reassembly
16. Use a torque wrench to gradually tighten nuts to torque rating in sequence shown in Figure 28.
Tighten head bolts in stages of 1/3 full torque, 2/3 full torque, and then full torque.
Figure 28 ST 700 Standard Transmitter - Head Bolt Tightening
Sequence
17. Feed the ribbon cable on the new meter body through the neck of the housing.
CAUTION: To prevent damage to the ribbon cable, use care when assembling
the meter body to the electronics housing.
18. Screw the new meter body into the housing until the bottom of the meter body adapter is
flush with the neck of the electronics housing.
19. Tighten the outside set screw to be sure it is fully seated in the slot in the header.