EasyManua.ls Logo

HP R1500 - UPS XR - Preparing the Rails for Integrated Shipping

HP R1500 - UPS XR
115 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ERM installation 58
4.
Insert screws through the mounting rail into the cage nuts or clip nuts.
5. Tighten the wing nuts or hex nuts.
Preparing the rails for integrated shipping
If the unit is to be shipped in a rack:
1. Remove the hex nuts from the mounting rail.
2. Install the rail reinforcement plates and tighten using the hex nuts with captive washers, included in the
kit, instead of the nuts included with the rail.

Table of Contents

Related product manuals