EasyManua.ls Logo

Huawei FusionDC1000A - Page 117

Huawei FusionDC1000A
180 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Documents: documents delivered with the camera, monitoring drawings and
parameters
Skill requirement: ELV engineer
Procedure
Step 1 Remove the front cover of the camera and remove the screws from the front
cover.
Step 2 Remove the inner cover.
Figure 4-55 Removing the inner cover
NO TE
In the scenario with an SD card, remove the SD card and install it in a new camera.
Step 3 Use a Phillips screwdriver to remove the screws that fasten the camera to its base.
Figure 4-56 Removing the camera base
FusionDC1000A Prefabricated All-in-One Data
Center
Maintenance Guide (IT Scenario) 4 Parts Replacement
Issue 01 (2021-04-20) Copyright © Huawei Technologies Co., Ltd. 109

Table of Contents

Other manuals for Huawei FusionDC1000A

Related product manuals