3.6.5 Fire Extinguishing System (CE)
● Semi-annual maintenance of the re extinguishing system involves system
commissioning. Before the maintenance, inform the related administrative
departments that the
re extinguishing system will be maintained and stop
working.
● Before maintaining the
re extinguishing system, remove the electrical actuator
from the container valve of the re cylinder. This prevents the extinguishant
release due to misoperations, and prevents accidental damage.
● After the maintenance, reconnect the electrical actuator, and inform the
administrative departments that the
re extinguishing system has become
operational.
Table 3-18 Semi-annual maintenance checklist for the re extinguishing system
Device Method Check Standard Maintenance Guide
Fire
extinguishing
system
commissioni
ng
Commission the re
extinguishing system
by following the
instructions in the
Fire Extinguishing
System
Commissioning (CE)
section in the
commissioning guide
for the solution in
use.
Devices work properly, and the
management system displays
related alarms.
Replace the
corresponding
component.
Fire alarm
bell
Flip the key to
Enable Control on
the extinguishant
control panel
rightward. Press
Silence/Sound
Alarm to start or
abort the
re alarm
bell. Reset the key to
Enable Control by
ipping it leftward.
The alarm bell rings normally.
The alarm bell rings loud and
clear when it is started.
1. Check and reconnect
cables to the re
alarm bell.
2. If the fault persists,
replace the re alarm
bell.