Step 5 Remove the front and rear sealing plates from the smart cooling product base.
Figure 4-4 Removing sealing plates from the smart cooling product base
Step 6 Reinstall the removed ESD oors.
● The ventilation oor panel of the hot aisle can be reinstalled after the water
rell and drainage pipes of the smart cooling product are removed.
● Adjust the height of the oor tray to ensure that the reinstalled oor panels are
ush with other oor panels.
Step 7 Remove fasteners at the top and bottom of the smart cooling product.
FusionDC1000A Prefabricated All-in-One Data
Center
Maintenance Guide (IT Scenario) 4 Parts Replacement
Issue 01 (2021-04-20) Copyright © Huawei Technologies Co., Ltd. 61