NO TICE
Cut a pipe inside the smart cooling product about 20 mm away from a
turning point in the vertical direction.
Cut a pipe outside the smart cooling product about 40 mm away from the
bottom of the smart cooling product on the vertical direction.
Figure 4-15 Cutting pipes
(1) Cutting points on smart cooling product pipes
Step 12 Move the smart cooling product.
NO TICE
Steel plates and pipes must be placed a certain distance away from the pre-fab.
module side wall to prevent scratching the side wall.
1. Take the ttings for moving the smart cooling product from the pre-fab.
module tting bag.
NO TE
The ttings required for moving the smart cooling product include one 3 mm thick
steel plate and ve 0.5 m long DN32 steel pipes.
2. Place the 3 mm thick steel plate on the raised
oor in the cold aisle.
3. Place two 0.5 m long steel pipes on the steel plate.
FusionDC1000A Prefabricated All-in-One Data
Center
Maintenance Guide (IT Scenario) 4 Parts Replacement
Issue 01 (2021-04-20) Copyright © Huawei Technologies Co., Ltd. 71