Figure 4-43 Installing a guide rail
3. Install a ller panel for guide rails. Fasten the M6 screws to install the ller
panel for the guide rails.
Figure 4-44 Installing a
ller panel for guide rails
4. Install the cage nuts that secure the IVS1800. The cage nut installation
locations are the rst and sixth holes along the guide rails, as shown in the
following
gure.
FusionModule500 Smart Mini Data Center
User Manual 4 Installation Guide
Issue 01 (2020-11-30) Copyright © Huawei Technologies Co., Ltd. 93