Check Item Specications Check Result
Equipment room
height
≥ 2.6 m □ Passed □ Failed
Equipment room
area
≥ 10.15 m
2
□ Passed □ Failed
Equipment room
maintenance
clearance
At least 1200 mm, 1000 mm,
and 1000 mm maintenance
clearance should be reserved
from the front door, rear, and
side of the cabinet, respectively.
At least 100 mm clearance
should be reserved from the
wall.
□ Passed □ Failed
Power system 208–240 V 1Ph 50 Hz/60 Hz □ Passed □ Failed
Water port Condensate drain outlet: Drains
condensate water from the
smart cooling product.
□ Passed □ Failed
NO TE
If any of the requirements is not met, contact Huawei technical support.
4.1.3 Site Equipment Preparation
All cabinets and devices have been delivered to the site and checked against
the delivery list.
Cabinets and devices need to be transported to the specied positions based
on the detailed equipment room layout diagram and unpacked for further
installation.
CA UTION
Pay attention to the following when unpacking batteries:
Insert a
at-head screwdriver into the gap between the wooden crate and its
top cover. Then pry o the top cover along the external edge of the cover until
the cover can be taken out from the crate.
Be careful to prevent your hands from being hurt by nails during unpacking.
FusionModule500 Smart Mini Data Center
User Manual 4 Installation Guide
Issue 01 (2020-11-30) Copyright © Huawei Technologies Co., Ltd. 59