Figure 4-12 Installing a lithium battery
NO TICE
The lithium battery weighs about 43 kg. Check the load-bearing capability of
the rack tray before installation.
The lithium battery is 396 mm deep. Check the depth of the rack before
installation.
The lithium battery can be installed in a 19-inch rack with guide rails and a
tray. Check whether the load-bearing capability meets requirements.
If multiple lithium batteries are installed, certain clearances should be reserved.
The space for each lithium battery should be at least 3 U. The lithium batteries
cannot be directly stacked or vertically placed.
Install lithium batteries from bottom to top.
Step 2 Install the protective covers for the positive and negative poles of the lithium
batteries.
Step 3 Install other lithium batteries in the same way.
----End
4.2.5.2 (Optional) Installing Busbars
Prerequisites
If there is more than one lithium battery, install busbars.
Procedure
Step 1 Install busbars.
1. Open the cabinet rear door.
FusionModule500 Smart Mini Data Center
User Manual 4 Installation Guide
Issue 01 (2020-11-30) Copyright © Huawei Technologies Co., Ltd. 73