Installation
162 810770 Operator Manual Echion
Turn on the pump
1. Set the pressure to345bar(5,000psi).
2. On the operator interface, touch the symbol to start the pump.
3. Let the pump operate for2 to3 minutes.
4. Monitor for leaks.
Adjust the boost pump pressure
1. Make sure that the value on the prefilter water-pressure gauge is between6.9bar
and7.6bar(690kPa and760kPa/100psi and110psi).
If the pressure is not in range:
a. Pull the boost pump adjustment knob out.
b. Turn the knob clockwise to increase the pressure. Turn the knob counterclockwise to
decrease the pressure.
c. Push the knob in to lock it.
2. Close all doors and replace all panels and covers, including the top cover.
CAUTION
A leak can cause damage to the water fittings.
Identify the source of a leak and correct the problem.
CAUTION
Do not set the boost pump pressure higher than7.6bar(760kPa/110psi). The components
are rated for a maximum of8.6bar(860kPa/125psi).
Pressure that is too high can cause damage to the components.
If the supply water is from a reverse osmosis system, contact a Hypertherm Technical Service
Associate for information and support.
1
Postfilter water-pressure gauge
2
Prefilter water-pressure gauge