Operation
Echion Operator Manual 810770 41
Turn on the pump: beginning of day
Follow this procedure when starting the pump for the first time each day or at the beginning of each
work shift. Daily preventive maintenance tasks are included in these instructions.
Inspect the pump
1. Remove the top cover.
a. Use a standard screwdriver to turn the bolt on each end counterclockwise1/4 turn.
b. Lift the cover off of the alignment pins .
2. Remove the front panel.
Push down on the horizontal surface on top of the panel to release the retainers tabs from the
frame .
Unless otherwise recommended, install the top cover and the front panel before operating the
pump.