EasyManua.ls Logo

Hypertherm Echion - Page 92

Hypertherm Echion
194 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Preventive maintenance
3
92 810770 Operator Manual Echion
Preventive maintenance
12. When Turn Off the Cutting Head flashes on the screen:
a. Turn
OFF the cutting head.
b. Touch the symbol to continue.
13. When Examine the Pump flashes on the screen:
a. Examine the pump for loose fittings or leaks.
b. Examine the attenuator connections for leaks.
c. Touch the symbol to continue.
The main motor turns off.
The primary operation screen opens.
14. Install the top cover and the front panel.
The pump is ready for operation.

Table of Contents

Related product manuals