EasyManua.ls Logo

IAI RCON Series - Page 109

IAI RCON Series
120 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Quick Start Guide ~ RCON PROFINET IO Specification ~
p109
©2023 / IAI Corporation
STEP
STEP
STEP
Operation
Table
of
Contents
Initial Connection of EC
Complement
When an ELECYLINDER is connected to IA-OS for the first time after delivery,
the transportation load setup window for the initial connection should open.
In the transportation load setup, the maximum payload of the connected actuator
is set in default.
* It is a setup only for the smart tuning applicable models.
* The transportation load setting is available also for revising later.
Once the transportation load setting is transferred, the following “Information”
window should appear. Click [OK] .
(2)
The “Payload setting” window will be displayed.
Click [OK] if setting is not necessary.
(1)
When a value out of the recommended range is set, the following window
should appear.
Once the setting is complete, the Simple data settingwindow becomes
available for editing.
“Information” window
(2)
Click
Payload setting window
(1)
Click

Related product manuals