Quick Start Guide ~ RCON PROFINET IO Specification ~
p119
©2023 / IAI Corporation
Revision History
2020.06
2021.06
2022.02
2023.01
2023.04
1A
1B
2A
2B
2C
First Edition issued
●Minor corrections made (in general)
●STEP1-2 Clamp filter deleted for cable connection between 200V
driver unit and actuators
●STEP2-1 Capture data changed in accordance with installation
tool design change
●STEP2-2 Note added for RCON gateway special parameter "MON“
Signal
●STEP2-3 How to download GSDML file updated (in accordance
with homepage renewal)
●TEP1-1 Complementary explanation added to Wiring to System
I/O Connector (2)
●Correction made (cable model codes)
(Applied to English from this version)