Quick Start Guide ~ RCON PROFINET IO Specification ~
p81
©2023 / IAI Corporation
STEP
3
STEP
1
STEP
2
Initial Setting
Table
of
Contents
Start the communication. Once the PLC communication starts, the PLC area
should turn to orange as shown in the figure below.
“Download extension to device” window
Put a checkmark to found in the PLC area on the Download
Extension to Device window, and the status LED lamp equipped on the main
unit of the PLC can be flashed. By this, it can be confirmed that the
communication between the PLC and PC is established in normal condition.
LAN Cable
RUN/STOP
ERROR
MAINT
“Download extension to device” window
RUN/STOP:Green and Orange
alternate blinking
ERROR:Red Blinking
MAINT:Orange Blinking
Click
(4)
LED Test
Complement