a.
Determine
where
in
the
rack
to
place
the
system.
The
system
you
are
about
to
install
measures
4
EIA
units
high.
Make
note
of
the
EIA
location
number.
Note:
An
EIA
unit
on
your
rack
consists
of
a
grouping
of
three
holes.
See
the
previous
figure.
b.
Facing
the
front
of
the
rack
and
working
from
the
right
side,
place
a
supplied
self-adhesive
dot
next
to
the
top
hole
of
the
bottom
EIA
unit.
Note:
The
self-adhesive
dots
are
used
to
aid
in
identifying
locations
on
the
rack.
If
you
no
longer
have
any
of
the
dots,
use
some
other
form
of
marking
tool
to
aid
you
in
identifying
hole
locations
(for
example,
tape,
a
marker,
or
pencil).
c.
Place
another
self-adhesive
dot
next
to
the
top
hole
of
the
above
EIA
unit.
Note:
If
you
are
counting
the
holes,
begin
with
the
hole
identified
by
the
first
dot
and
count
up
four
holes.
Place
the
second
dot
next
to
the
fourth
hole.
d.
Repeat
substeps
6a
through
6d
for
the
corresponding
holes
located
on
the
left
side
of
the
rack.
Appendix
D.
Setting
Up
the
System
411

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IBM P 615 series and is the answer not in the manual?

IBM P 615 series Specifications

General IconGeneral
BrandIBM
ModelP 615 series
CategoryServer
LanguageEnglish

Related product manuals