EasyManuals Logo

IBM S85 pSeries 680 User Manual

IBM S85 pSeries 680
691 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #116 background imageLoading...
Page #116 background image
16. Perform the following:
a. Disconnect the ac power cable from the customers power source.
b. Exchange one of the following FRUs:
1) SPCN card
2) ac box
3) System-rack operator-panel card
c. Reconnect the ac power cable to the power source.
d. Attempt to power on the system.
e. If the system powers on, the FRU you exchanged is the failing item.
If the system does not power on, repeat steps 16a through 16e of this
procedure and exchange the next FRU in the list.
f. If the system does not power on after exchanging all the FRUs in the list, ask
your next level of support for assistance.
This ends the procedure.
17. Have all of the racks and units on the system become powered on?
No Return to MAP 1520: Power on page 88.
Yes Go to step 18 of this procedure.
18. Continue the IPL.
Does the IPL complete successfully?
No Go to Entry MAP on page 79.
Yes This ends the procedure. Go to Map 0410: Repair Checkout in the
Diagnostic Information for Multiple Bus Systems.
94 Service Guide

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IBM S85 pSeries 680 and is the answer not in the manual?

IBM S85 pSeries 680 Specifications

General IconGeneral
BrandIBM
ModelS85 pSeries 680
CategoryServer
LanguageEnglish

Related product manuals