..................... 4 pcs
........................1 pc
Set Screw, 4 x 6 mm
Washer, 5 x 9 x 1 mm
Washer, 5 x 9 x 1 mm
Use Green  
Threadlock
Green
Set Screw, 4 x 6 mm (4 pcs)
Tail Drive Joint, Front
Bevel Pinion  
Bearing Case
Bevel Pinion Gear
Flange
Bevel Pinion Bearing Case Direction
Green
Flange must face bevel gear.
Green
Apply a thin coating of green threadlock 
to shaft pinion of assembly.
Poly Zap
Slide and spread.
Poly Zap
260 mm/230 mm
Poly Zap
Wipe lightly  
w/finger or towel.
Step A
Step B Step C
DRIVE SHAFT GUIDE BEARING ATTACHMENT
Attach the tail drive joint and 
secure so that there is no 
fore/aft movement of the shaft, 
but the shaft will spin freely in  
the bearing assembly.
5-3
BEVEL PINION GEAR ASSEMBLY
Note:
Use Poly Zap  
(not included) to attach  
bearings to the drive shaft.
Once the Poly Zap  
is applied and the guide  
bearings are in their  
correct positions  
(260 mm/230 mm),  
the Poly Zap can be  
quick cured using  
Zip Kicker.
Position the shaft  
assembly on a flat  
surface before/while  
the Poly Zap is curing.
It is very important  
that the guide bearings be  
attached to the shaft at 
non equal measurements  
as shown to prevent  
resonance vibration  
and fatigue.
Lightly oil bearings after the glue has dried.
Do not apply  
Poly Zap to  
inside of ball  
bearings.
Note:
260 mm 230 mm
Follow this procedure when attaching:
Front
Rear
Bearing Positions
5-2