– 9 –
Procedures of assembling
1. Insert the crank rod
, balancer
,handpulleygearA
, bobbin winder driver wheel
, and the
main shaft counterbalance
❶
in the main shaft
❼
inthisorder,andmounttheassemblyontheframe.
2. Insert the taper screw
❸
inthetaperholeofthemainshaft,andtightenit.Then,tightenthesetscrew
❷
toxthemainshaftcounterbalance
❶
.
3.Lightlypressthemainshaftcounterbalance
❶
in the direction of the arrow D and also the middle metal
inthedirectionofthearrowE.Then,tightenthetwosetscrews
❺
.
(Tightentherstscrewsothatittouchesatlyonthemainshaft
❼
.Then,tightenthesecondone.
Same procedures followed hereafter.)
4.Tightenthetwoeachsetscrews
❹
and
❻
,respectively.
(Makesurethattherstscrewtouchesatlyonthemainshaft
❼
.)
5.Pushthehandpulley
inthedirectionofthearrowFsothatthehandpulleygearA
is meshed with
thatthehandpulleygearB
.Inthisstate,xthepulleywiththetwosetscrews
.
6. Mount the main shaft motor
❽
and the coupling
❾
.
Refer to "3.-(2) Removal of the main shaft motor and coupling".
7.Fixthecrankrod
with the two setscrews
.
Refer to "3.-(3) Crank connecting rod connection/disconnection".
8.Fixthebalancer
with the two setscrews
.
Refer to "3.-(4) Crank balancer positioning".
9.Fixthebobbinwinderdriverwheel
with the two setscrews
.
Referto"3.-(29)Adjustmentofthebobbinwinderdrivingwheelposition".
*Trytoturnthemainshaft
❼
andconrmthatthereisnotorque.