Table 25: Site Preparation Checklist (continued)
DatePerformed byFor More InformationItem or Task
“Determining Transceiver Support
for ACX5400” on page 74
Cable Specifications for QSFP+ and
QSFP28 Transceivers
Acquire cables and connectors:
•
Determine the number of cables needed
based on your planned configuration.
•
Review the maximum distance allowed
for each cable. Choose the length of
cable based on the distance between the
hardware components being connected.
Plan the cable routing and management.
ACX5448, ACX5448-D, and ACX5448-M Site
Guidelines and Requirements
IN THIS SECTION
General Site Guidelines | 65
Site Electrical Wiring Guidelines | 65
Chassis Physical Specifications for ACX5400 Routers | 66
ACX5400 Router Environmental Requirements and Specifications | 67
ACX5400 Grounding Cable and Lug Specifications | 68
Clearance Requirements for Airflow and Hardware Maintenance for ACX5400 Routers | 70
Cabinet Requirements for ACX5400 Routers | 71
Rack Requirements for ACX5400 Routers | 72
64