EasyManua.ls Logo

Kampmann Venkon EC - Other Maintenance Work

Kampmann Venkon EC
84 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
75
Venkon EC 115 V
75
Maintenance
Other Maintenance Work
Wall-mounted unit,
4-way valve kit
8.3.4 Other Maintenance Work
-
Checkthewater-sideconnections,valvesandttings.
- Vent heat exchanger.
- Check the electrical wiring.
-Cleantheoutletgrilleandremovedirtfromtheairow.
- Check the antifreeze, if used.
Cleaning the condensate pump
Fig. 68: Condensate pump with
oat switch
Ventilkit 1-10
Ventilkit 41-48
Ventilkit 1-10
Ventilkit 41-48
Ceiling modelWall-mounted unit,
2-way valve kit
Thecondensatepumpwithoatswitchislocatedonthewater
connection side of the basic unit on all models. Its location
depends on the valve kit used on the wall-mounted version.
1. Openthecoveroftheoatswitch,cleantheoatswitch
and close the cover again.
Fig. 69: Opening the cover
IMPORTANT NOTE!
Checkthatthecondensatepumpandoatswitchis
working properly after cleaning!

Table of Contents

Related product manuals