EasyManua.ls Logo

Kampmann Venkon EC - Venting the Heat Exchanger; Switching on

Kampmann Venkon EC
84 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Venkon EC 115 V
62
62
Operation
Switching-on
IMPORTANT NOTE!
•Vent all other connecting lines on site.
• Top up the water level if necessary.
Repeat this work depending on the type and
design of the hydraulic network on site.
Open all (on-site) shut-off devices and valves.
Hold a receptacle in place to catch any water that escapes and
protect the environment from spraying water.
Then open the vent screw(s).
Close the vent screw when no more air and only water escapes.
Switch on the mains voltage.
Start up the Venkon fan coil unit using the control unit connected.
Check the fan speeds by switching the stage selector.
Check the correct operation of the heating or cooling valves by
altering the room temperature setpoint Take into account the
different response times depending on the controller.
Add water to the condensate tray - the pump should automatically
switch on and off again.
Test the condensate alarm: Add water until the external device
(warning alert, shut-down mechanism) is triggered.
7.2 Venting the Heat Exchanger
7.3 Switching On
Loud noises can occur with initial suction!

Table of Contents

Related product manuals