EasyManua.ls Logo

Kampmann Venkon EC - Maintenance Schedule

Kampmann Venkon EC
84 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Venkon EC 115 V
64
64
Operation
MaintenanceSchedule:
8.2 Maintenance Schedule:
The sections below describe maintenance work needed for the
properandtrouble-freeoperationoftheequipment:
If there are signs of increased wear during regular checks,
adjust the required maintenance intervals to the actual wear
and teat. Contact the manufacturer with any questions about
maintenance work and intervals (
Chapter 1.4 „Customer
Service“ on page 8).
Interval Maintenance task Personnel
asrequired Displayonroomcontrolunit-rstreadtheseparateinstructionsCaretakers/users
for the room control unit
Regularvisualinspectionofthexingand Caretakers/users
examination of damage
quarterly Visuallyinspectthelterandreplaceifnecessary Caretakers/users
(
Chapter 8.3.1. „Changing the Filter“ on page 67)
every six Clean the inside of the unit Caretakers/users
months
(
Chapter 8.3.3 „Cleaning Work on the Basic Unit“ on page 72)
every six Water-side connections, valves, threaded connections Caretakers/users
months
(
Chapter 8.3.2 „Cleaning the Condensate Pump“ on page 75)
every six Vent the heat exchanger Caretakers/users
months
(
Chapter 8.3.4 „Cleaning the Condensate Pump“ on page 75)
every six Check the electrical connections Caretakers/users
months
(
Chapter 8.3.4 „Visual Inspections“ on page 70)
everysix Cleantheoutletgrille,removedepositsfromtheairow Caretakers/users
months
(
Chapter 8.3.4 „Other Maintenance Work“ on page 75)
every six Check antifreeze (if necessary) Caretakers/users
months
(
Chapter 8.3.4 „Other Maintenance Work“ on page 75)
every six Maintain the condensate pump Caretakers/users
months
(
Chapter 8.3.3 „Cleaning the Condensate Pump“ on page 75)

Table of Contents

Related product manuals