EasyManua.ls Logo

Kampmann Venkon EC - Installation (General)

Kampmann Venkon EC
84 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
41
Venkon EC 115 V
41
Installation and Connections
Installation (General)
Installation (General)
Personnel: Installation personnel
Protectiveequipment: Safety shoes
Protective gloves
Specialtools: Pallet truck
CAUTION!
Risk of injury from sharp metal housing!
The inner metal of the casing can have
sharp edges.
Wear suitable protective gloves.
2 people are needed to install the unit.
Thedenitionoftheconnectionsideisdeterminedlookingtowards
the fan coil‘s air outlet.
The media connections are as standard on the left side, with the
electrical connections on the right side.
The fan coil can be used with and without casing. When a fan coil is
orderedwithcasing,thefrontpanelisfactory-tted,withtheside
panels being supplied separately (see Fig. 18). It is not necessary to
remove the front panel to install the electrics and hydraulics, as all
thenecessaryconnectionsareattheside.Thesidemullionsaretted
oncethebasicunithasbeenxedinplaceandtheelectricaland
hydraulic connections made.
Fig. 17: Denition of the
connection side
Water connection, left
Water connection, right
Water connection, left
Water connection, right
Wall-mounted design
Ceiling model
Fig. 18: Delivery of unit with casing0
L
L
L
L

Table of Contents

Related product manuals