Start-up
31
Pos: 17.15 /Üb erschriften/Üb erschriften 2/F-J/G elenkwelle m ontieren @ 2\m od_120239 8342788_78.doc @ 59253
6.3 Install the PTO shaft
Pos: 17.16 /BA/I nbetriebnahm e/EasyCut/Anba u Gelenkwell e/Anbau Gele nkwelle @ 3\mod _1204702102 883_78.doc @ 7 1462
AFA-0-005
2
1
Fig. 11:
• Swivel the PTO shaft bracket under the Weiste triangle
• Push the PTO shaft (1) onto the front PTO shaft of the tractor and secure
• Secure the PTO shaft guard against turning with the retaining chain (2).
Pos: 17.17 /BA/-- ---Seitenum bruch------ @ 0\m od_119617531 1226_0.doc @ 4165