56 / 151 Issued: 16.06.2010 Version: MA KL 1500-3 T S 141215 V1 en
KL 1500-3; KL 1500-3 T; KL 1500-3 S
9. Screw on the M20 hexagon nuts and lock washers and tighten them one
after the other with a torque wrench. Gradually increase the tightening
torque to a value of 120 Nm.
For M16 chemical anchors with Dynamic Set:
mount filling disc, spherical washer, nut and lock washer and tighten with
torque wrench. Gradually increase the tightening torque to a value of
90 Nm. Inject hybrid resin into hole in filling disc. Allow the hybrid resin to
cure.
10. Retighten the hexagon nuts after 100 hours of operation.
The mounting base is now ready for the linear unit to be installed.
8.2 Installing a linear unit with a one-piece beam
Preconditions The bedplates are anchored to the floor as described in Section
(>>> 8.1 "Installing the mounting base" page 55).
The connecting cables and energy supply system cables are installed on
the system side.
The site of installation must be accessible with a fork lift truck or with a
crane. Observe the minimum payload capacity.
Procedure 1. Lower the linear unit with bolted-on strips (>>> Fig. 8-2) (4) onto the plates.
≥273 K (0 °C) 1 hour
268 K (-5 °C) 5 hours
Fig. 8-1: Installing the chemical anchors
1 Setting tool 4 Hexagon nut
2 Drill 5 Resin capsule
3 Chemical anchor rod 6 Hole in the plate
Temperature Time