4 -20
Lift rod (LH) Lift rod (RH)
521~635 mm
(20.5~25.0 in)
495~635 mm
(19.5 ~ 25.0in)
① Upper link installation and
adjustment
Select a suitable attaching hole(2) depending on
the implement.
To adjust the length of the upper link, release the
locking spring(3) and turn the sleeve(4) with
handle(6).
Fix the handle(6) with locking spring(3) after
adjusting.
Adjustment range : 550~855mm (21.7~33.7 in)
② Adjustment of lift-rod (Left/Right)
For lift rod (LH): After removing the upper lift-rod
pin, detach the upper part(1) of the lift-rod from
the lift-arm and turn the upper part left or right.
For lift rod (RH): Lift up the handle(4) and turn it
to the left or right to adjust the length. Lock the
handle(4) in place after adjusting.
⑥
④
②
⑤
③
Upper link
④
③
①
②
▶ Do not adjust the length of the upper link over the maximum limit. It may cause
fatal injury or death by falling object.
Caution
▶ Do not adjust the length of the lift-rod over the maximum limit. It may cause fatal
injury or death by falling object.
Caution