14000 OPERATOR MANUAL SETUP AND INSTALLATION
4
Boom Top Wire Rope Guide
Rope Guard Installation
14COM4178a
Item Description
1 Clamp Assembly
2 Clamp Assembly with Rope Guard
3 Rope Guard with Cotter Pin
4 Wire Rope Guide Modification
2 1
1
2 1
3
3
2
2
1
Both Sides of
Sheave
1
Inboard Side of Both
Upper Sheaves
3
3
2
1
Inboard Side of Both
Upper Sheaves
3
2
1
Both Sides of
Sheave
Two Load Lines to
Lower Boom Point
Luffing Hoist Rope to
Luffing Jib Struts
FIGURE 4-56 continued