EasyManua.ls Logo

Manitowoc 14000 - Page 251

Manitowoc 14000
270 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Reference Only
Manitowoc Published 03-29-17, Control # 064-23 v2 4-113
14000 OPERATOR MANUAL SETUP AND INSTALLATION
4
R
F
2
1
3
S7
S6
S5
S4
S3
S2
S1
2
3
R
F
2
1
3
S7
S6
S5
S4
S3
S2
S1
2
3
1
Item Description Item Description
1 Boom Top Wire Rope Guide F Front Drum (Drum 1)
2 Upper Boom Point (see Figure 4-56
) R Rear Drum (Drum 2)
3 Load Block — 220 USt (199,6 t)
6064-3_4
14.0 ft
4,3 m
18.6 ft
5,7 m
14.0 ft
4,3 m
18.6 ft
5,7 m
NOTE: Load block (3) to Lower Boom Point
(2) minimum distance is controlled
by 2-1/2° fleet angle
12 Parts of Line
11 Parts of Line
Dead-End Socket And Wedge
Block-Up Limit Weight
FIGURE 4-57 continued
1

Table of Contents

Other manuals for Manitowoc 14000

Related product manuals