Manitowoc Published 04-06-18, Control # 231-14 4-113
MLC650 VPC-MAXâ„¢ OPERATOR MANUAL SET-UP AND INSTALLATION
4
Disconnecting the Mast Top and Second Insert
Straps
See Figure 4-94 for the following procedure.
1. Disconnect the straps from the links in the working
position.
2. Remove the hair pin cotters (1) from the retaining pin (2)
that secures the VPC-MAX
beam links (3).
3. Rotate the links from the working position to the stored
position.
4. Remove the retaining pin and rotate the beam link
retaining pin brackets (4) from the working position to
the stored position.
5. Install the retaining pin and hair pin cotters to the
retaining pin brackets.
6. Remove the hair pin cotters (5) and retaining pins (6)
from the bracket (7) in the stored position.
7. Make sure the links and straps are in the stored position.
8. Install the retaining pins and hair pin cotters.
9. Repeat this process for the other side of the mast top
and insert.
STORED POSITION
WORKING POSITION
FIGURE 4-94
Item Description
1 Hair Pin Cotter (qty 4)
2 Retaining Pin (qty 2)
3 VPC-MAX Beam Link (qty 4)
4 Beam Link Retaining Pin Bracket (qty 4)
5 Hair Pin Cotter (qty 12)
6 Retaining Pin (qty 6)
7 Bracket

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc VPC-MAX MLC650 and is the answer not in the manual?

Manitowoc VPC-MAX MLC650 Specifications

General IconGeneral
BrandManitowoc
ModelVPC-MAX MLC650
CategoryConstruction Equipment
LanguageEnglish

Related product manuals