EasyManua.ls Logo

Manitowoc VPC-MAX MLC650 - Installing the Large Main Stop Blocks

Manitowoc VPC-MAX MLC650
234 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SET-UP AND INSTALLATION MLC650 VPC-MAX™ OPERATOR MANUAL
4-146
Published 04-06-18, Control # 231-14
See Figure 4-123 for the following procedure.
NOTE: The following instructions describe how to store the
counterweight tray plates and pendants. If
necessary, first attach the tray to the assist crane
and place the tray in the necessary storage or
shipping location.
4. Remove the plates (1) and pendants (2) from the assist
crane.
5. Coil the pendants into the storage pockets in the
counterweight tray assembly (3).
6. Place the plates in the storage pockets in the tray.
7. Prepare the counterweight tray for storage or shipping
as necessary.
Installing the Large Main Stop Blocks
Install the large main stop blocks to the rotating bed by
reversing the removal procedure. See "Removing the Large
Main Stop Blocks" on page 4-140.
FIGURE 4-123
Item Description
1Plate (qty 2)
2 Pendant (qty 4)
3 Counterweight Tray Assembly

Table of Contents

Related product manuals