EasyManua.ls Logo

Mar Cor Purification MILLENIUM HX - Page 30

Mar Cor Purification MILLENIUM HX
158 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Millenium HX RO System
3030226 Rev. D 2-12 Installation And
Initial System Start-Up
31. Press the Feed Water Condition Alarm. Set the RO feed water quality alarm 50
TDS/100 µS above the steady state Combined Pump Feed Water Condition
noted in step 14. If the Combined Pump Feed Water Condition is greater than
or within 50 TDS/100 µS of the alarm limits of 1000 TDS/2000 µS, disable the
alarm to prevent nuisance alarms. To disable the alarm, set the TDS setting to
1001 or conductivity setting to 2001 µS. Once complete, press .
32. Press RETURN TO MAIN.
33. The RO product may be used in conjunction with hemodialysis treatment
equipment only after obtaining test results, which validate compliance with
accepted standards.
AAMI or CSA Product Water Panel
Microbiological Culture (colony count) results
Endotoxin (pyrogen) level testing
34. The Millenium HX RO is now ready for use.

Table of Contents

Related product manuals