EasyManua.ls Logo

Megger MTR105 - Supply Phase Rotation

Megger MTR105
100 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7. The result can be saved by pressing the SAVE button. A
message will inform you the data was saved and which asset
ID it was saved to.
5.3 Supply Phase Rotation
1. Connect the test leads to the MTR105.
1.1. Press the Information ( ) button to view the lead set
up diagram.
NOTE: when the diagram is displayed a test cannot be
performed. Press Information ( ) button to return to the test
screen
2. Turn rotary switch to select Voltmeter (V) position.
3. Press soft keys 2 and 3 to move the carousel left or right
through sub-modes to Supply Phase Rotation.
NOTE: The full title text of the sub-mode will appear in the
secondary field for a few seconds.
Voltmeter
30 www.megger.com

Table of Contents

Related product manuals