8-1
8 Hardware and Software Upgrade
8.1 Hardware Upgrade
The monitor supports upgrade of the following functions:
SpO
2
measurement
Temp
erature measurement
8.1.1 Upgrade Package
Upgrade package Description of upgrade package PN of upgrade
package
SpO
2
Masimo SpO
2
upgrade kit 115-027698-00
Nellcor SpO
2
upgrade kit 115-027699-00
Temperature Temperature module 115-027700-00
Note: measurement accessories are not included in the above upgrade packages.
8.1.2 Upgrading Parameter Modules
8.1.2.1 Upgrading Nellcor SpO
2
Contents of upgrade package:
A Nellcor SpO
2
board;
An SpO
2
insulator;
A connector panel assembly for Nellcor SpO
2
board; and,
Two M3×6 screws
1. Remove the power management board and connector panel assembly as
described in section 6.3 Disassembling the Main Unit.
2. Assemble the SpO
2
board and insulator onto the power management board as
described in section 6.3.6 Removing the Parameter Board (SpO2 Optional) and
Power Management Board.
3. Install the power management board assembly with the SpO
2
board and the
connector panel assembly in the service kit into the main unit as described in
section 6.3 Disassembling the Main Unit.