NOTE To confirm the above operation, check the local header!!
The display should be as follows:
Finally, the ladder network must be finalised by connecting up the elements as follows.
Note that the Pointer now changes to a small pencil icon.
햹
On the Ladder diagram click on the left point on the ladder diagram and “Click – Drag”
across the diagram and release on the ‘EN’input on the ‘PLS_M’function as shown below:
The circuit is now complete.
Application Program Building a Project
4-20 MITSUBISHI ELECTRIC
햷
Right click the mouse anywhere in the edit window
area and de-select the
Auto connect
function.
햸 In the same manner, click to select
Interconnect
Mode
.