Chapter 5 Final Checkout Gen 3 Site Controller System Manual
Final Checkout Setup
5-2 68P80801E30-A 5/1/2002
Final Checkout Setup
The following procedures should be performed after installation of the site
controller is complete. This Final Checkout procedure ensures the proper
operation of the site controller.
1. On the Cabinet, set all circuit breakers to OFF.
Figure 5-1 shows the Cabinet Breaker Panel.
For details of the AC/DC Power System for the SRSC, refer to the SRSC
GEN 4 EBTS section of the EBTS System Manual. (on CD: 98P80800A17)
RFS3 CTRL A RFS2 EAS/IMU CTRL B
7.5A
OFF
ON
iSC076
060796JNM
7.5A3A25A25A7.5A3A3A25A25A
BR1 BR3 RFS1 BR2 BR4
OFF
OFF
OFF
OFF
OFF
OFF
OFF
OFF
OFF
OFF
Figure 5-1 Cabinet Breaker Panel for standard site
controller rack or SRRC (front view)