Chapter 4
Installation
Chapter Overview
This chapter provides procedures required to permanently install the system
into the selected site. The following table lists this chapter’s topics.
Section Page This section . . .
Installation Overview 4-2 provides general information for the
installation procedures
Cabinet Installation 4-3 defines the methods for installing wheeled and
non-wheeled equipment cabinets
Intercabling
Connections
4-7 provides step-by-step instructions for
connecting power, ground, timing, Ethernet,
alarm, T1/E1, and antenna connections