7 Commissioning
Maschinenfabrik Reinhausen GmbH 2018 595252433/02 EN ECOTAP
®
VPD
®
CONTROL PRO
7 Commissioning
This chapter describes how to commission the device.
NOTICE
Damage to device and system periphery
An incorrectly connected device can lead to damages in the device and sys-
tem periphery.
Check the entire configuration before commissioning.
Prior to commissioning, be sure to check the actual voltage and operating
voltage.
7.1 Performing tests
The following description does not apply if you have ordered the device ver-
sion with control cabinet. If that is the case, follow the description in the
ECOTAP VPD MD&C operating instructions.
Please contact Maschinenfabrik Reinhausen GmbH (MR) if any aspect of
the tests is not clear.
7.1.1 Ground test
For commissioning, carry out a ground test (check of the protective bonding
impedance) in accordance with IEC 61010-1. Observe the following informa-
tion when testing:
Test current: 2 times the rated current of the overcurrent protection device
in the supply line.
Test duration: 1 minute for each measurement point.
The measured voltage between the measurement point and the protective
conductor must be less than 10V.
To carry out the ground test, proceed as follows:
Apply the test current at the grounding terminal of the G1 PULS DIMEN-
SION QS3.241 assembly using a constant current source and measure
the voltage between the measurement point and the protective conductor.
ð The measured voltage must remain less than 10V for a period of 1
minute.