EasyManua.ls Logo

Newport e360 - Air, O2 and AC Power Connections; Install the Breathing Circuit System

Newport e360
150 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
OPR360U A0509
5-1
5
OPR360U A0509
5-1
5
OPR360U A0509
5-1
5
OPR360U A0509
5-1
5
OPR360US H0711
3-6
3
Unpacking, Assembly, and Safety Check
EnsurethattheACpowercordisconnectedtothettingontheback
oftheventilator.Tightentheretainingclampasneededtosecurethe
cord.SeeFigure3-6,B.
Caution Periodically inspect the air and oxygen inlet water traps and
drain water from the bowls as necessary by pressing the pin at the
bottom of the bowl.
Install the Breathing Circuit System
1. FirmlyinstallthedisposableltersontheTo Patient port and the
From Patient port.
Optional:IftheExpiratoryFilterHeaterisinuse,installalterinto
the heated system instead of on the From Patient port.
2. Installatwo-limbbreathingcircuitandhumidicationsystem
accordingtopatientrequirements.SeeFigure3-7,3-8and3-9
for setup options.
A
B
Figure 3-6 Air, O2
and AC Power Connections

Table of Contents

Other manuals for Newport e360

Related product manuals