EasyManua.ls Logo

NTM SSQ MultiPro - Figure 28: Clip Relief Roller Assembly

NTM SSQ MultiPro
118 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CHAPTER 12
CLIP RELIEF ROLLER ASSEMBLY
39
CLIP RELIEF ROLLER ASSEMBLY
1. Clip Relief Rollers (Figure 28) provide a raised area next to the male and female
legs of the panel. This helps hide the clip and screws used in installation. They
rollers can be engaged or disengaged as needed.
2. Find the Tooling Rail Sheet corresponding to the profile installed in your machine
(Figure 59 - Figure 79).
Note the location of clip relief assembly’s on left and right tooling rails, and
locate them on the tooling set in your machine.
3. To engage the clip relief rollers loosen lock down screw “A” and insert a 5/32”
allen wrench into the small hole on the top eccentric shaft “B”.
4. Rotate the eccentric shaft to engage or disengage the top roller assembly from the
bottom roller assembly. Adjust both left and right bead assemblies to the desired
depth using a feeler gage. Recommend factory setting is 0.080 inches gap
between top and bottom rollers.
NOTE: The FF100 and FF150 profiles must always be engaged for proper
male/female lock to occur.
Figure 28: Clip Relief Roller Assembly

Table of Contents