CHAPTER 14
WIDTH CHANGE PROCEDURE
43
5. Load the reeled coil onto the machine using a fork lift or other rated lifting
device. Making sure the tail of the coil goes over the top and points toward the
shear end of the machine. See coil routing diagram (Figure 12).
6. Cut a 1” triangle of off the 2 leading corners of the coil and feed it into the
entry guides. (Figure 32)
Figure 32: Loading Material
7. Start the machine and use the Jog button on the Manual Control Box or
Computer, to jog the material through the machine 6 to 8 inches at a time until
it exits the last forming stations, and is about 1” from the Bead Roller
Assembly. (Figure 21).
SHUT YOUR MACHINE DOWN BEFORE PROCEEDING.